A concise, field-tested Quality Control checklist you can run before every Revit deliverable to reduce rework and RFIs.
Pre-flight and Model Health
- Audit on open; review warnings and drive the total below an agreed threshold (track top offenders weekly).
- Purge Unused carefully (twice), then delete orphaned views, groups, and line patterns; remove unused materials and render assets.
- Confirm Project Information, Location, and Shared Coordinates. Pin Survey/Base Points; verify True North vs Project North.
- Set Project Units (precision, rounding); verify level elevations and grid naming conventions.
Views and Templates
- All plotted views use a View Template; no temporary hide/isolate; Section Box off unless intentional.
- View Range, Phase Filter, and Design Options consistent with the sheet intent.
- Filters are named and documented; category overrides minimized and standardized.
- Working views are excluded from sheets and clearly prefixed (e.g., _WK_).
Annotations and Graphics
- Text/Dimensions use office standards; no “None” text style; leaders and arrows consistent.
- Dimensions reference stable geometry (references or locked datums); spot elevations/slopes validated.
- Tags read from the correct parameters; room/space tags present with verified numbers and names.
- Keynote file path verified; legends are view-independent and coordinated.
Families and Parameters
- Purge unused family types; verify nested families, visibility settings, and reference planes.
- Shared Parameters align with office standard GUIDs; unit types and parameter types correct.
- Type Marks unique; fire rating, assembly code, and specification parameters populated where required.
- Classification fields (OmniClass/UniFormat) and IFC parameters completed for exports.
Schedules and Quantities
- Sorting, filtering, and formatting match deliverable intent; phase-aware where applicable.
- Calculated values documented; hidden fields used intentionally; totals verified against model counts.
- Key Schedules drive consistency for rooms, doors, and finishes.
Sheets, Revisions, and Issue Sets
- Title block parameters populated (Project, Sheet Number/Name, Scale, Issue, Revisions, Consultant data).
- Viewport alignment and scale standards enforced; placeholder sheets reconciled.
- Revision clouds assigned to the correct sequence; revision schedule cleansed of old/unused entries.
Links, CAD, and Coordinates
- RVT links By Shared Coordinates; paths set to Relative; unused links unloaded; “Room Bounding” set as needed.
- CAD files linked (not imported), cleaned (layers, units, purge), and on their own workset.
- Design Option and Workset visibility verified across deliverable views.
Exports and Deliverables
- PDF: standardized naming, vector quality, fonts embedded, print styles applied; test a batch set.
- DWG: export setup mapped to your CAD standard; units, layers, and hatches validated.
- IFC: correct setup/template, property sets, base quantities, and classification export verified.
- Navisworks: NWC from publish views, shared coordinates, linked files included per coordination plan.
Automation and Oversight
- Create a “QC Dashboard” sheet with color-fill and schedules surfacing missing data (“TBD”, nulls, duplicates).
- Use Dynamo or lightweight macros to flag noncompliant elements and populate required parameters.
- Document the QC run (date, who, key findings) and archive with the issue set.
Looking to standardize and scale this checklist? Explore Autodesk Revit and vetted add-ins at NOVEDGE, including Revit subscriptions and plugins that streamline QA/QC. For licensing, upgrades, and expert guidance, start with NOVEDGE | Autodesk Collection and browse Revit-focused tools on NOVEDGE Revit Solutions.