"Great customer service. The folks at Novedge were super helpful in navigating a somewhat complicated order including software upgrades and serial numbers in various stages of inactivity. They were friendly and helpful throughout the process.."
Ruben Ruckmark
"Quick & very helpful. We have been using Novedge for years and are very happy with their quick service when we need to make a purchase and excellent support resolving any issues."
Will Woodson
"Scott is the best. He reminds me about subscriptions dates, guides me in the correct direction for updates. He always responds promptly to me. He is literally the reason I continue to work with Novedge and will do so in the future."
Edward Mchugh
"Calvin Lok is “the man”. After my purchase of Sketchup 2021, he called me and provided step-by-step instructions to ease me through difficulties I was having with the setup of my new software."
Mike Borzage
September 27, 2026 3 min read

When window documentation is accurate, coordinated, and easy to read, the entire drawing set becomes more reliable. In Revit, a well-built Window Schedule lets you control type information, sizes, performance data, quantities, and notes from one location rather than manually maintaining separate spreadsheets.
Start by creating a schedule from View > Schedules > Schedule/Quantities and selecting the Windows category. The goal is not simply to list every placed window; it is to produce a clear, issue-ready window schedule that can be understood by architects, consultants, contractors, and fabricators.
In the Sorting/Grouping tab, sort first by Type Mark or Family and Type. Then uncheck Itemize every instance to consolidate identical windows into one row. Add the Count field to display the total number of occurrences for each type. This is one of the most effective ways to turn a raw Revit database report into a practical window-type schedule.
Be deliberate about schedule formatting. Rename field headings to match your office standards—for example, change “Family and Type” to “Window Type.” Adjust column widths, center short values such as Type Mark and Count, and use consistent units for dimensions. In the Formatting tab, verify that Width and Height are displayed with the correct rounding accuracy. A schedule that shows 3'-0 1/256" when 3'-0" is sufficient creates unnecessary visual noise.
A common mistake is using the family name as the only identification system. Family names often describe construction logic rather than the information needed on construction documents. Instead, maintain a stable Type Mark and ensure window tags report that same value. This creates a dependable relationship: the plan tag identifies W03, and the schedule defines exactly what W03 means.
Before issuing, place the schedule on a sheet and review it as a contractor would. Check for blank Type Marks, duplicate type identifiers, missing dimensions, and unexpected counts. If a row looks wrong, select it in the schedule and use Highlight in Model or inspect the affected instances to identify the source.
For dependable Revit workflows, family content, and BIM production tools, explore Autodesk Revit resources from NOVEDGE. A disciplined window schedule is more than a table: it is a coordinated, live connection between your model and your construction documentation.
You can find all the Revit products on the NOVEDGE web site at this page.