Take precise control of model clarity and performance by managing Workset visibility per view.
-
Set the right defaults once:
- Collaborate > Worksets. For each workset, decide if it should be Visible in all views. Turn this off for heavy or discipline-specific worksets (e.g., “Facade,” “Site Context,” “MEP Coordination”).
- Reserve “Shared Levels and Grids” for datum elements and keep it visible by default to avoid missing references and broken documentation.
-
Override visibility per view:
- In a view, press VG (or VV) > Worksets tab. Set individual worksets to Visible, Hidden, or By default for that view.
- Use this to create crisp documentation views by hiding non-essential worksets (e.g., furniture, entourage) while keeping design coordination views broader.
-
Lock consistency with View Templates:
- Create a view template for each purpose (Documentation, Coordination, Presentation, RCP, etc.).
- In the template, enable Worksets under the Include parameters list. Configure workset visibility once, then apply the template to all relevant views.
- Use separate templates by discipline and phase to eliminate ad‑hoc per‑view edits.
-
Manage linked model worksets:
- VG > Revit Links > Select the link > Display Settings > Custom > Worksets. Turn linked worksets on/off without altering the host model’s own worksets.
- Set at the link Type level so all instances follow the same rule. Use “By Linked View” when the consultant provides curated visibility in their model.
-
Open only what you need:
- When opening the model, use Specify to close heavy worksets (site, detailed interiors, large point-cloud containers). This speeds up load and navigation dramatically.
- Manage > Worksets lets you open/close worksets during a session. Remember: closing a workset hides it in all views for you, but it’s a session choice—use view templates for published output control.
- Quality check: Use Collaborate > Worksharing Display > Worksets to visualize element ownership and quickly spot items on the wrong workset. Reassign via Properties > Workset.
- Naming standards matter: Prefix by discipline or system (A‑Core, A‑Facade, S‑Primary, M‑Supply, E‑Lighting) to make filtering and templates predictable.
- Avoid pitfalls: Don’t place critical datums or scope boxes on non-default or rarely visible worksets. Avoid relying on Temporary Hide/Isolate for deliverables—bake rules into templates.
- Performance tip: Keep highly detailed families, CAD imports, and point clouds on dedicated, normally hidden worksets. Show them only in views where they add value.
Standardizing Workset visibility by view brings order, speed, and reliability to your documentation set. If you’re building office standards or upgrading Revit seats, check out NOVEDGE for licensing and deployment options, and explore Revit solutions curated by NOVEDGE to support your team’s workflows. For tailored guidance, training, or add‑ons that complement your worksharing strategy, connect with the experts at NOVEDGE.