"Great customer service. The folks at Novedge were super helpful in navigating a somewhat complicated order including software upgrades and serial numbers in various stages of inactivity. They were friendly and helpful throughout the process.."
Ruben Ruckmark
"Quick & very helpful. We have been using Novedge for years and are very happy with their quick service when we need to make a purchase and excellent support resolving any issues."
Will Woodson
"Scott is the best. He reminds me about subscriptions dates, guides me in the correct direction for updates. He always responds promptly to me. He is literally the reason I continue to work with Novedge and will do so in the future."
Edward Mchugh
"Calvin Lok is “the man”. After my purchase of Sketchup 2021, he called me and provided step-by-step instructions to ease me through difficulties I was having with the setup of my new software."
Mike Borzage
July 29, 2026 2 min read

Accurate MEP space areas are essential for dependable load calculations, airflow analysis, equipment sizing, and documentation. In Revit, a Space is more than an annotation: it is an analytical container that can report area, volume, occupancy, and HVAC-related data. Establishing reliable boundaries early prevents incorrect calculations later.
Start by confirming that every intended space is properly enclosed. Revit calculates a Space area from room-bounding elements, including walls, floors, ceilings, shafts, and linked architectural models when their settings are configured correctly.
If a Space displays an area of zero or does not place at all, the problem is almost always related to boundaries. First, inspect the architectural link. Select the linked model, open Type Properties, and confirm that Room Bounding is enabled where appropriate. Architectural walls, floors, roofs, and ceilings may also need to be designated as room bounding in their individual properties.
For open-plan zones, partial enclosures, or locations where architectural boundaries do not reflect the desired HVAC zone, use Space Separation Lines. These lines establish analytical boundaries without changing the physical building model. They are especially useful for:
Do not rely only on the Area value shown in a plan. Create a Space Schedule to review the model systematically. Go to View > Schedules > Schedule/Quantities, select Spaces, and add fields such as Space Number, Name, Level, Area, Volume, Occupancy, and any project-specific airflow or load parameters. Sort the schedule by Level and Space Number, then use filters to identify zero-area, unplaced, or incomplete spaces.
A practical quality-control method is to compare scheduled Space areas with the architectural room schedule. Small differences may be intentional, but significant discrepancies should be investigated before analysis begins. Coordinate decisions with the architectural team, particularly when walls move, ceilings change, or a linked model is reloaded. Space boundaries can change as the architectural design develops.
For consistent results, establish a simple office standard:
Well-managed Space areas create a trustworthy foundation for every downstream MEP workflow. For Revit software, training resources, and professional BIM tools, visit NOVEDGE. A clean Space schedule is not just a report—it is an early warning system for coordination issues that could affect design calculations and construction documentation.
You can find all the Revit products on the NOVEDGE web site at this page.

July 29, 2026 2 min read
Read More
July 29, 2026 3 min read
Read More
July 29, 2026 2 min read
Read MoreSign up to get the latest on sales, new releases and more …