Revit Tip: Master Elevation Marker Workflow for Consistent Multi-Floor Elevations

January 24, 2026 2 min read

Revit Tip: Master Elevation Marker Workflow for Consistent Multi-Floor Elevations

Create elevation markers once and drive consistent multi-floor elevations that are easy to maintain and effortless to reference across plans and sheets.

Set up first:

  • Create a dedicated Elevation type (Manage > Object Styles > Elevations) with the right marker size, arrow visibility, and “Hide at scales coarser than” tuned for your plan scales.
  • Build a View Template for elevations (graphics, far clip, phase filter, detail level, shadows, annotation settings). Lock it to your elevation type. If you need Revit or add-ins, check NOVEDGE.
  • Define Scope Boxes named per level (e.g., SB_L02, SB_L03) sized to control consistent width and vertical extent across stories.

Place one “master” elevation marker:

  • In a coordination plan, place a single building elevation marker outside the footprint and aim its arrows (N/E/S/W or only the directions you truly need).
  • Open one elevation view, perfect the graphics, and save/assign your View Template.

Create multi-floor elevations efficiently:

  • Duplicate the cleaned elevation for each floor (Duplicate View > Duplicate). Rename with a clear convention: “E-North – L02,” “E-North – L03,” etc.
  • Assign the appropriate Scope Box to each duplicated elevation to lock consistent width and top/bottom crop per level.
  • Use Align and Pin on the master marker in plan so all elevations stay registered to grids; then use Propagate Extents to carry consistent grid/level 2D extents across all elevation views.

Reference the same view from multiple floor plans:

  • Open a floor plan, start Elevation, and in Properties set “Reference Other View = Yes.”
  • Click to place a marker and select the correct existing elevation (e.g., “E-North – L03”). This places a tag that references the view instead of creating a new one.
  • Repeat on other floors so each plan shows a correctly referenced elevation bubble that stays coordinated with sheet and detail numbers.

Graphic and coordination tips:

  • Keep Far Clip Active and Far Clip Offset controlled by the View Template to prevent accidental depth drift between levels.
  • Use Annotation Crop to limit tags near the building skin while keeping model crop consistent via Scope Boxes.
  • For interior cores, consider a second, smaller elevation type with a compact marker to reduce plan clutter.
  • Leverage “Hide at scales coarser than” on the elevation tag type so markers don’t appear in overall or key plans.

Quality control checklist:

  • Confirm each plan’s elevation bubble references the intended view and sheet; spot-check the “View Reference” label in the tag family for clarity.
  • Verify parapets, roofs, and pits aren’t cropped out; adjust vertical extents in the Scope Box if needed.
  • Batch audit: a quick Browser search on “E-” should reveal a complete, level-by-level set per direction.

Scaling this workflow with Dynamo or purpose-built add-ins can save hours on large projects; explore options at NOVEDGE or consult their team for implementation guidance.



You can find all the Revit products on the NOVEDGE web site at this page.







Also in Design News

Subscribe